Our kits can overlay over existing tile or go directly to the studs.
Trim the MCB, if necessary
02
Install
Use appropriate techniques to securely install the shower base, including mosaic tiles if applicable
Apply approved construction adhesive to the back wall panel and after utilizing the correct application method, hold it in place for 30 seconds to ensure proper suction
Install first side panel and use a diamond-hole saw to make the necessary adjustments to the MCB
Install second side panel ensuring a snug fit
03
Seal
Seal Joints and Corners: Apply recommended silicone sealant to seal joints, corners, and the shower base, ensuring water-tightness
Add Finishing Trim: If required, add finishing metal-edge trim to both side panels for a polished look
04
Dry
Let the installation dry for at least 3 hours before use, with full readiness achieved after 24 hours.