Moderno Shower Systems

Installation

Our Installation Process

01

Prep

  • Gather required tools and materials.
  • Prep the walls as you normally would
  • Our kits can overlay over existing tile or go directly to the studs.
  • Trim the MCB, if necessary

02

Install

  • Use appropriate techniques to securely install the shower base, including mosaic tiles if applicable
  • Apply approved construction adhesive to the back wall panel and after utilizing the correct application method, hold it in place for 30 seconds to ensure proper suction
  • Install first side panel and use a diamond-hole saw to make the necessary adjustments to the MCB 
  • Install second side panel ensuring a snug fit

03

Seal

  • Seal Joints and Corners: Apply recommended silicone sealant to seal joints, corners, and the shower base, ensuring water-tightness
  • Add Finishing Trim: If required, add finishing metal-edge trim to both side panels for a polished look

04

Dry

  • Let the installation dry for at least 3 hours before use, with full readiness achieved after 24 hours.